3.7 C
Москва
Понедельник, 10 ноября, 2025

Installation of the front door — Procedure

If the front door is worn out, its protective functions are outdated, then only one thing remains for the residents — replace it as quickly as possible. Here: Dveri-V-Tumeni. You can choose an interest of several types of interest. After the choice is made, it will be necessary to set the door to the opening. Some believe that they may well cope with installation on their own. Perhaps this is so, but there is enough forces and skills to understand after a detailed familiarization with the key stages of installation.

Preparation of the tool

Without the availability of the necessary tool, you do not even need to start work. It will take a drill and drill, a hammer, screwdrivers, a nail and much more. In the practice of specialists, there are often a fewer openings. You have to knock down part of the masonry or concrete ceiling, which cannot be done without using a punch.

Key stages

In order for the installation of doors in Tyumen to be carried out optimally quickly and safely, it is recommended to start the activity together. Will have to remove the canvas from the frame, and then install it back. It will be difficult to produce all these manipulations. When the tool is prepared, then adhere to the next installation order:

Removing the worn door. The foam is cut off at the place of contact of the structure with the wall, as well as all the fasteners are removed. Sometimes the frame is tightly fixed in the opening, and then it is cut out only with the help of a grinder;

Removing the canvas of the new door from the frame. Put it nearby, since very soon you will have to install it back. In order not to damage the paintwork, set up the fabric;

Installation of the frame in the opening. If there are protruding parts that prevent the full location of the element, then remove them;

alignment. It will require a level, as well as a hammer with a rubber tip. If it is not possible to fix exactly, then plastic or wooden stands of various thicknesses are used;

fastening. There are factory holes in the frame where self -tapping screws or dowels are inserted for fixing in the opening. Before fastening in concrete or brick, it will be necessary to drill holes;

door assembly in the reverse order. Now the canvas is worn back. One person lifts the structure, and the other directs the loops. Under its own weight, the canvas will fall into place;

Checking the quality of work. Close and open the door several times and test the work of the keyboard. If everything is functioning, and there is no creak, it means that the result is achieved.

The installation of doors in Tyumen ends with filling the space between the frame and the opening of construction foam. It sealing and improves fixation strength.

.

Похожие статьи:

ОСТАВЬТЕ ОТВЕТ

Пожалуйста, введите ваш комментарий!
пожалуйста, введите ваше имя здесь